Located within the borders of Yahyalı, Kayseri, Yahyalı WPP attained a production license on 07.09.2011 thanks to BAK ENERJİ ÜRETİMİ A.Ş. The first acceptance by the Ministry of Energy and Natural Resources for Yahyalı WPP whose construction started in 2016 was made in 2016 and the plant’s 82.5 MW-section was put into use in 2017. Of the 10.35 MW-capacity increase permitted in 2019, the 9 MW was put into use in 2023 upon its acceptance by the Ministry of Energy and Natural Resources. Yahyalı WPP has an installed capacity of 91.5 MW with 25 Vestas V126 3.3 MW-turbines and two Vestas V150 4.5 MW-turbines. Plus, the plant was given permission to increase its capacity further to 20.4 MW in 2022. Procedures to incorporate the capacity of 20.4 MW into the license are on track.
Apart from the wind energy capacity increases, 71.4168 MW auxiliary source solar power plant, which will operate as a hybrid system in 2021, is entitled to be installed. A total installed capacity of 71.4168 MWm was commissioned with the acceptances of the Ministry of Energy and Natural Resources on 14 March 2024 with 17.4174 MWm, 16 May 2024 with 14.0855 MWm, 11 July 2024 with 18.63 MWm, 23 August 2024 with 9.9385 MWm and 28 April 2025 with 11.3425 MWm.
The license installed capacity of the Yahyalı Project is 167.4168 MWm/92.85 MWe and the commissioned capacity is 162,9168 MWm/91.5 MWe.
Address: Yahyalı / KAYSERİ
Phone/Fax: 0352 619 1201 / 1200