Yahyalı Power Plant Plants

YAHYALI SOLAR POWER PLANTS

Bewen Energy is establishing a 71.42 MW Solar Power Plant as an auxiliary source for the Yahyalı Wind Power Plant in Kayseri. It is intended to serve as a combined renewable electricity production facility together with the solar energy investment. With the acceptance of 4 inverter groups in March 2024, 3 inverter groups in May 2024, 4 inverter groups in July 2024 and 3 inverter groups in August 2024 an additional capacity of 60,0743 MW was put into operation. The Solar Power Plant investment is aimed to be completed in the first half of 2024.

Address: Yahyalı / KAYSERİ

Phone/Fax: 0352 619 1201 / 1200

Bewen Enerji
Licensed Installed Power
71,416
Bewen Enerji
Installed Power Commissioned
60,0743 MWm
Bewen Enerji
Average Annual Production
115.200 MWh
Bewen Enerji
Average Annual Decrease Carbon
71.400 Tons