Bewen Energy has installed a 71.4168 MW Solar Power Plant as an auxiliary source to the Yahyalı Wind Power Plant in Kayseri. It is intended to serve as a combined renewable electricity generation facility together with the solar energy investment. An additional capacity of 71.4168 MW was commissioned with the MENR acceptance of 4 inverter groups in March 2024, 3 inverter groups in May 2024, 4 inverter groups in July 2024, 3 inverter groups in August 2024 and 2 inverter groups in April 2025.