Turguttepe WPP, for which a generation licence was obtained by SABAŞ ELEKTRİK ÜRETİM A.Ş. on 08.06.2007, is located within the borders of Milas District of Muğla and Çine District of Aydın. Started in 2009, the first ERO acceptance of Turguttepe WPP was made in 2010 and the entire plant was commissioned in 2011. Turguttepe WPP has an installed capacity of 24 MW with 12 Vestas V90 2 MW turbines. Turguttepe licence power has increased to 44.6 MWe with the capacity increase in 2016 and 2023.
Address: Milas / MUĞLA
Phone/Fax: 0252 513 0084 / 0450