Turguttepe Wind Power Plants

TURGUTTEPE WPP

Turguttepe WPP, for which a generation licence was obtained by SABAŞ ELEKTRİK ÜRETİM A.Ş. on 08.06.2007, is located within the borders of Milas District of Muğla and Çine District of Aydın. Started in 2009, the first ERO acceptance of Turguttepe WPP was made in 2010 and the entire plant was commissioned in 2011. Turguttepe WPP has an installed capacity of 24 MW with 12 Vestas V90 2 MW turbines. Turguttepe licence power has increased to 44.6 MWe with the capacity increase in 2016 and 2023. 

Address: Milas / MUĞLA

Phone/Fax: 0252 513 0084 / 0450

Bewen Enerji
Licensed Installed Power
45,2 MWm/44,6 MWe
Bewen Enerji
Installed Power Commissioned
24 MW/24 MWe
Bewen Enerji
Average Annual Production
69.128.000 kWh (For 24 Mw capacity in operation
Bewen Enerji
Turbins
12 Vestas V90 2 MW
Bewen Enerji
Average Annual Decrease Carbon
44.850,246 metric tons (For 24 MW capacity in operation)